Risks of Design Stage in Iraqi Construction Project

Abstract: The management of construction projects needs to complete the basics of system management and work. Starting from the idea and how to turn it into a full study and ended at the construction project completion arriving at the purpose prepared for it, so the projects need to control on its operation and integration system in order to succeed. It is no secret for who concerned in construction projects field that the design stage is a very important stage in construction project because it determines the fin… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…The risk of continuous change in work and specifications Use an effective system for project management like Building Information Modeling (BIM) to plan, designed and manage the execution of the project to efficiently manage the change order process [21] The consulting team should have enough time to carefully study the project specifications which may reduce the change in specifications [25] 9…”
Section: Risk Of Financing Failurementioning
confidence: 99%
“…The risk of continuous change in work and specifications Use an effective system for project management like Building Information Modeling (BIM) to plan, designed and manage the execution of the project to efficiently manage the change order process [21] The consulting team should have enough time to carefully study the project specifications which may reduce the change in specifications [25] 9…”
Section: Risk Of Financing Failurementioning
confidence: 99%
“…However, construction projects have a tendency for key participants to work separately and focus on individual goals, rather than project goals. This tendency is a result of standard industry contracts and a legacy of litigation within the industry [9]. In most construction projects, best possible performance is unachievable with poor productivity resulting in time overrun and consequently cost escalation of the projects, because the construction is a risky industry with uncertainties due to many external and internal factors that influence the construction process [10].…”
Section: Introductionmentioning
confidence: 99%