2020
DOI: 10.36001/ijphm.2012.v3i1.1362
|View full text |Cite
|
Sign up to set email alerts
|

Role of Prognostics in Support of Integrated Risk-based Engineering in Nuclear Power Plant Safety

Abstract: There is a growing trend in applying a prognostics and health management approach to engineering systems in general and space and aviation systems in particular. This paper reviews the role of prognostics and health management approach in support of integrated risk-based applications to nuclear power plants, like risk-based in-service inspection, technical specification optimization, maintenance optimization, etc. The review involves a survey of the state-of-art technologies in prognostics and health managemen… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 53 publications
0
1
0
Order By: Relevance
“…Low value assets such as filters in many industrial applications are often replaced based on a time-based maintenance strategy due to the filters not being instrumented which results in there not being a direct way of measuring the currently health of the filter [1]. In many applications it is usually easy to replace these low value assets, however, in the nuclear sector this is not always the case [2]. This can be due to many factors, for example regulatory considerations, replacement time, and engineer safety.…”
Section: Introductionmentioning
confidence: 99%
“…Low value assets such as filters in many industrial applications are often replaced based on a time-based maintenance strategy due to the filters not being instrumented which results in there not being a direct way of measuring the currently health of the filter [1]. In many applications it is usually easy to replace these low value assets, however, in the nuclear sector this is not always the case [2]. This can be due to many factors, for example regulatory considerations, replacement time, and engineer safety.…”
Section: Introductionmentioning
confidence: 99%