2013 IEEE International Conference on Industrial Technology (ICIT) 2013
DOI: 10.1109/icit.2013.6505875
|View full text |Cite
|
Sign up to set email alerts
|

Role of Time Synchronization in Power System Automation and Smart Grids

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
9
0
1

Year Published

2015
2015
2024
2024

Publication Types

Select...
5
3
1

Relationship

0
9

Authors

Journals

citations
Cited by 16 publications
(10 citation statements)
references
References 2 publications
0
9
0
1
Order By: Relevance
“…This CPT allowed for testing the detection functionality for various fault-locator devices. A synchrophasor or phasor measurement unit (PMU), on the other hand, measures the magnitude and phase angle to determine the health of the electrical grid and only requires 30 observations per second [50]. Adikari et al built a CPT to explore PMUcontrol interactions with the power grid by leveraging RTDS and various PMU HIL possibilities [51].…”
Section: Timing and Data Synchronizationmentioning
confidence: 99%
See 1 more Smart Citation
“…This CPT allowed for testing the detection functionality for various fault-locator devices. A synchrophasor or phasor measurement unit (PMU), on the other hand, measures the magnitude and phase angle to determine the health of the electrical grid and only requires 30 observations per second [50]. Adikari et al built a CPT to explore PMUcontrol interactions with the power grid by leveraging RTDS and various PMU HIL possibilities [51].…”
Section: Timing and Data Synchronizationmentioning
confidence: 99%
“…Protocolbased time synchronization uses network-based time-distribution protocols such as the Network Time Protocol (NTP). Popular methods currently used for time distribution in smart grids described here are summarized in Table 3: • Global Navigation Satellite System (GNSS) is a system of satellites with global coverage, facilitating geospatial positioning and precise time [50]. GNSS is an American company.…”
Section: Timing and Data Synchronizationmentioning
confidence: 99%
“…However, the PMUs need to be co-located to avoid communication delays. Wide Area Measurement Systems (WAMS) are being employed in the power industry for real-time measurements of different grid parameter [12], [13]. Current systems, such as SCADA (supervisory control and data acquisition)/EMS (energy management systems), do not provide efficient solutions in the case of cascading because these systems are designed to act locally.…”
Section: Introductionmentioning
confidence: 99%
“…Priključenje obnovljivih izvora energije intermitentne prirode može dovesti do naglih promena naponskih prilika i tokova snaga u EES-u ugrožavajući stabilnost sistema. To je jedan od razloga zašto je potrebno da sinhronizovanost i preciznost merenja budu na visokom nivou čineći Wide Area Measurement System (WAMS) koji predstavlja tehnologiju za unapređenje uvida u stanje EES-a [1].…”
unclassified