2012 XXth International Conference on Electrical Machines 2012
DOI: 10.1109/icelmach.2012.6350064
|View full text |Cite
|
Sign up to set email alerts
|

Rotor design for PM generators reflecting the unstable neodymium price

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
39
0
1

Year Published

2016
2016
2022
2022

Publication Types

Select...
5
2
1

Relationship

3
5

Authors

Journals

citations
Cited by 47 publications
(40 citation statements)
references
References 15 publications
0
39
0
1
Order By: Relevance
“…A research project has investigated designing a new generator for the 200 kW VAWT, where NdFeB is substituted with ferrite magnets. Results show that very similar electromagnetic characteristics can be achieved [48] only differing slightly in overload behavior [49]. The next step in this project is to build a first ferrite generator prototype based on a developed 12 kW design [50].…”
Section: Research On Generators For Vawtsmentioning
confidence: 99%
“…A research project has investigated designing a new generator for the 200 kW VAWT, where NdFeB is substituted with ferrite magnets. Results show that very similar electromagnetic characteristics can be achieved [48] only differing slightly in overload behavior [49]. The next step in this project is to build a first ferrite generator prototype based on a developed 12 kW design [50].…”
Section: Research On Generators For Vawtsmentioning
confidence: 99%
“…To investigate the effect of increased top head mass on the tower mass, a relationship between tower mass and top head mass (for a 90m hub height) can be found by fitting a power law curve to the data in [26], (18) Using the structural steel cost from Table III, the tower cost's relationship to top head mass, Ctower (k€) can be approximated by a linear function in the range 400 < mtop < 600 tonnes as, (19) In terms of foundation type, a monopile was assumed in this study. Based on [27] and [28], for a 6MW wind turbine with a 90m hub height in 30m water depth, the relationship of substructure and foundation mass, msf with top head mass can be given as (20) Using the steel cost from Table III (assuming 60% pile and 40% transition piece and outfitting steel), The effect of any increased generator mass on the turbine substructure and foundation cost, Csf (k€) can be approximated by a linear function for 400 < mtop < 600 tonnes as, (21) E. Optimization Design optimization methods generally use an algorithm which take independent variables as input and vary those input to evaluate dependent variables in machine model and hence optimize an objective function (subject to predetermined constraints).…”
Section: Tower and Foundation Costmentioning
confidence: 99%
“…The magnetic properties of the chosen magnet materials are given in [19]. Lumped parameter magnetic circuit models are used to calculate flux per pole.…”
Section: B Electromagnetic Modelmentioning
confidence: 99%
See 1 more Smart Citation
“…Nd 2 Fe 14 B-magnets can be used in the LG. Issues regarding environment, health, and price [28] do however make these rare earth magnets unfit for a sustainable WEC. Ferrite permanent magnets (PMs), with magnetization in the direction of motion, are placed between pole shoes and used in the LG.…”
Section: Introductionmentioning
confidence: 99%