2021
DOI: 10.1109/access.2021.3062144
|View full text |Cite
|
Sign up to set email alerts
|

Safe Bayesian Optimization for Data-Driven Power Electronics Control Design in Microgrids: From Simulations to Real-World Experiments

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
4
2

Relationship

1
5

Authors

Journals

citations
Cited by 8 publications
(7 citation statements)
references
References 32 publications
0
7
0
Order By: Relevance
“…In the corresponding article, the RL agent lacks behind concerning the steady-state error compared to a classical PI controller but outperforms it in terms of total demand distortion. The measurement-based validation of the simulation setting used for the power grid application can be found in [22]. As shown in [23], RL is already applied in literature to solve power grid stability and power quality problems, but in a discrete state and action space without the usage of deep neural networks and without focusing on stationary accuracy of the reference tracking problem.…”
Section: A State Of the Artmentioning
confidence: 99%
See 3 more Smart Citations
“…In the corresponding article, the RL agent lacks behind concerning the steady-state error compared to a classical PI controller but outperforms it in terms of total demand distortion. The measurement-based validation of the simulation setting used for the power grid application can be found in [22]. As shown in [23], RL is already applied in literature to solve power grid stability and power quality problems, but in a discrete state and action space without the usage of deep neural networks and without focusing on stationary accuracy of the reference tracking problem.…”
Section: A State Of the Artmentioning
confidence: 99%
“…It is assumed to be a part of the environment such that the control agent never needs to handle any signals in the abc frame. Utilization of this transformation is a well-established method, as no further system information is necessary for applying this simplification [22], [28]. A dead time of one simulation step is assumed within the plant system to account for the controller calculation delay that is common for digital control systems.…”
Section: A Electrical Power Grid Applicationmentioning
confidence: 99%
See 2 more Smart Citations
“…These systems collect surplus electricity from sustainable sources and provide electricity during periods of high demand or low generation. The main objectives of utilizing these storage systems are to enhance energy efficiency, reduce reliance on fossil fuels, and optimize storage and usage costs [7], [8].…”
Section: Introductionmentioning
confidence: 99%