Canadian International Petroleum Conference 2006
DOI: 10.2118/2006-105
|View full text |Cite
|
Sign up to set email alerts
|

Sand Face Completion for a Shallow Laminated Gas Pay With High Fines Content

Abstract: The Shallow Clastics Field, which is operated by Sarawak Shell, primarily targets two shallow gas-bearing reservoirs, H1 and H2, at approximately 2,650 ft true vertical depth (TVD). An appraisal/early-producer well with a deviated wellbore was drilled through the H1, H2 targets, and a completion design consisting of a cased and perforated commingled completion inside 9-5/8-in. casing was implemented. The sand-face completion design consisted of a large-OD expandable sand screen with 150 micron weave that opene… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2018
2018
2018
2018

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 1 publication
0
0
0
Order By: Relevance