2011
DOI: 10.1007/s00170-011-3554-5
|View full text |Cite
|
Sign up to set email alerts
|

Scheduling a single machine to maintain a dynamic WIP profile in coordinated manufacturing chains

Abstract: This article addresses the problem of selecting and scheduling several jobs on a single machine to sustain the desired dynamic work-in-process profile. We consider sequence-dependent setup times between jobs and strictly enforced time window constraints on the start time of each job. We use working shift production targets to coordinate decentralized local schedulers and make them inline with the manufacturing chain goals. Based on the discretization of scheduling time horizon, we propose a two-step mixed-inte… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
5
0

Year Published

2013
2013
2013
2013

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(5 citation statements)
references
References 26 publications
0
5
0
Order By: Relevance
“…This article targets this gap. With the exception of the studies of Jula and Rafiey (2012) and Jula and Kones (2012) the problem as outlined in this article has not been addressed previously. Jula and Rafiey (2012) introduced two algorithms based on the discretisation of the planning horizon to constant and static intervals, namely the Common Grid Points Network (CGPN) and the Individual Jobs Grid Points Network (IJGPN) algorithms.…”
Section: International Journal Of Production Research 3655mentioning
confidence: 91%
See 4 more Smart Citations
“…This article targets this gap. With the exception of the studies of Jula and Rafiey (2012) and Jula and Kones (2012) the problem as outlined in this article has not been addressed previously. Jula and Rafiey (2012) introduced two algorithms based on the discretisation of the planning horizon to constant and static intervals, namely the Common Grid Points Network (CGPN) and the Individual Jobs Grid Points Network (IJGPN) algorithms.…”
Section: International Journal Of Production Research 3655mentioning
confidence: 91%
“…We compared the results with the only existing relevant models in the literature, introduced by Jula and Rafiey (2012) and Jula and Kones (2012). Jula and Rafiey (2012) introduced two network-based algorithms based on the discretisation of the planning horizon to constant and static intervals, namely the Common Grid Points Network (CGPN) and the Individual Jobs Grid Points Network (IJGPN) algorithm.…”
Section: Methodsmentioning
confidence: 99%
See 3 more Smart Citations