2018 IEEE International Conference on the Science of Electrical Engineering in Israel (ICSEE) 2018
DOI: 10.1109/icsee.2018.8646225
|View full text |Cite
|
Sign up to set email alerts
|

Scheduling For 5G Cellular Networks With Priority And Deadline Constraints

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
5
2
2

Relationship

2
7

Authors

Journals

citations
Cited by 12 publications
(5 citation statements)
references
References 16 publications
0
5
0
Order By: Relevance
“…Considering RT solutions, works like [19], [32], [33] use schedulers based on EDF to assign priorities to packets based on their deadlines. EDF ensures the packets with the earliest deadline are transmitted first.…”
Section: Related Workmentioning
confidence: 99%
“…Considering RT solutions, works like [19], [32], [33] use schedulers based on EDF to assign priorities to packets based on their deadlines. EDF ensures the packets with the earliest deadline are transmitted first.…”
Section: Related Workmentioning
confidence: 99%
“…We then relax the problem into a linear program by allowing Time Division Multiplexing (TDM) at the sub-frame level. This work performs a parallel packet assignment differently than sequential greedy policies that the authors presented in [6], [11], and [12]. We use the following notation: boldface capital letters denote matrices, boldface lowercase letters denote vectors, and standard lowercase letters denote scalars.…”
Section: B Contributionmentioning
confidence: 99%
“…However, 3GPP specifications have not outlined any programming policies to support period of time or non‐real‐time application services, however leaves its style and implementation to the vendors. Hadar et al state 1 priorities and deadlines are taken into account for allocating resource blocks (RBs) and spatial beams to users by means of a simple scheduling algorithm. The overall system performance depends on the scheduling; it is stated by Kwan et al 2 Mennerich et al, 3 and Lien et al 4 Simply representing the scheduling problem as to allocate the scheduling block (SB) to a subset of user equipment (UE) (3GPP term for mobile terminal) in order to achieve some objective function.…”
Section: Literature Surveymentioning
confidence: 99%