2019
DOI: 10.1016/j.cie.2019.07.013
|View full text |Cite
|
Sign up to set email alerts
|

Scheduling multiple yard cranes in two adjacent container blocks with position-dependent processing times

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0

Year Published

2021
2021
2025
2025

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 27 publications
(7 citation statements)
references
References 29 publications
0
7
0
Order By: Relevance
“…Iris et al [3] presented an adaptive large-neighborhoodbased heuristic framework to solve the weekly berth and quay crane assignment problem. References [4][5][6] studied the YC scheduling problem, and Chu et al [4] studied the management of three yard cranes in two adjacent container blocks in line. Gharehgozli et al [5] researched the problems of both stacking and lifting tasks in a container yard.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…Iris et al [3] presented an adaptive large-neighborhoodbased heuristic framework to solve the weekly berth and quay crane assignment problem. References [4][5][6] studied the YC scheduling problem, and Chu et al [4] studied the management of three yard cranes in two adjacent container blocks in line. Gharehgozli et al [5] researched the problems of both stacking and lifting tasks in a container yard.…”
Section: Literature Reviewmentioning
confidence: 99%
“…(3) The horizontal moving speed of ARMG carts remains unchanged. (4) In the RYACT (or train), the operation time required for an ARMG to g is equal to that required to release a container.…”
Section: Assumptionmentioning
confidence: 99%
“…Zhou et al [16] and Iris et al [17] reviewed AGV use in green ports. Several studies [18][19][20][21][22][23] have focused on reducing the operation time and waiting time of AGVs. Other studies [24][25][26] have investigated YC scheduling rules and travel paths.…”
Section: Scheduling Study Of Agvs and Ycs In Automated Container Term...mentioning
confidence: 99%
“…Equation (18) establishes the relationship between the moment when the spreader of RGC r moves above the AGV operation lane and when RGC r starts interacting with the AGV in the operation task i. Equation (19) represents the end moment of task i. Equation (20) corresponds to the scenario when a ship's arrival is delayed, requiring temporary storage of the train-ship task i in the corresponding bay b of the temporary storage area.…”
Section: Utilization Rate Of Agv T Use F Ulmentioning
confidence: 99%
“…A crane is an important type of logistics equipment to realize material handling mechanization in factory workshops or warehouses, railway freight yards, port wharfs, and other locations [1,2]. Three phase AC (alternating current) asynchronous motors (hereinafter referred to as motors) serve as the main power devices for a crane's cart running mechanism, trolley running mechanism, and spout lifting mechanism [3,4].…”
Section: Introductionmentioning
confidence: 99%