2017
DOI: 10.1080/21681015.2017.1292961
|View full text |Cite
|
Sign up to set email alerts
|

Scheduling single machine with random breakdown and preemptive jobs

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
2
2

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 22 publications
0
1
0
Order By: Relevance
“…At present, many scholars have proposed many effective disturbance repairing methods to solve the occurrence of machine failure in the production system. In terms of model construction, Haleh [3] considered factors such as lead time / delay penalty cost and failure maintenance time comprehensively in the construction of interruptible single machine rescheduling model under the condition of machine failure. Ho [4] combined with the characteristics of textile and printed circuit board industries, constructed an unrelated parallel machine dynamic scheduling model considering the occurrence of machine failure.…”
Section: Introductionmentioning
confidence: 99%
“…At present, many scholars have proposed many effective disturbance repairing methods to solve the occurrence of machine failure in the production system. In terms of model construction, Haleh [3] considered factors such as lead time / delay penalty cost and failure maintenance time comprehensively in the construction of interruptible single machine rescheduling model under the condition of machine failure. Ho [4] combined with the characteristics of textile and printed circuit board industries, constructed an unrelated parallel machine dynamic scheduling model considering the occurrence of machine failure.…”
Section: Introductionmentioning
confidence: 99%