2018
DOI: 10.1007/s11367-018-1501-5
|View full text |Cite
|
Sign up to set email alerts
|

Screening LCA of torrent control structures in Austria

Abstract: Purpose The purpose of this article is to find a suitable life cycle assessment (LCA) method to quantify the most important environmental burdens caused by construction processes of torrent control structures. To find these environmental burdens, 17 construction projects of the BAustrian Service for Torrent and Avalanche Control^(WLV) were analyzed using the Bcradle to gate with options^LCA methodology (CEN, 2013). Methods This article explains an LCA methodology for the product stage and the construction proc… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0
1

Year Published

2018
2018
2024
2024

Publication Types

Select...
4
1

Relationship

1
4

Authors

Journals

citations
Cited by 7 publications
(8 citation statements)
references
References 6 publications
(4 reference statements)
0
7
0
1
Order By: Relevance
“…The methodological basics for the life cycle assessment of torrent control structures were created by screening the LCAs of several construction projects. Through the analysis of all relevant construction processes, it was possible to determine system boundaries, cutoff criteria, suitable data sources and hotspots of the processes (Paratscha et al 2019).…”
Section: Methodsmentioning
confidence: 99%
See 4 more Smart Citations
“…The methodological basics for the life cycle assessment of torrent control structures were created by screening the LCAs of several construction projects. Through the analysis of all relevant construction processes, it was possible to determine system boundaries, cutoff criteria, suitable data sources and hotspots of the processes (Paratscha et al 2019).…”
Section: Methodsmentioning
confidence: 99%
“…Due to the individuality and complexity of each protection system, it cannot be compared with others. However, the comparison between project variants of the protection system, which have identical performance characteristic, is possible because the same protection function can be achieved with different combinations of structures (Paratscha et al 2019).…”
Section: Definition Of the Functional Unitsmentioning
confidence: 99%
See 3 more Smart Citations