“…The load and renewable generation profile in [26], [27] is adapted for the simulation during the considered time horizon. The characteristics of thermal generators are given in Table I while considering the data in [27], [28], with their location being Bus {30, 37}, {31, 32, 33, 34, 35, 36, 38} and {39} respectively. Other system parameters are set as follows: load demand P D ∈ [5.16, 6.24] GW, load damping D = 0.5%P D /1 Hz, base power S B = 100MVA.…”