2016
DOI: 10.1002/ldr.2628
|View full text |Cite
|
Sign up to set email alerts
|

Sediment Yield Deduction from Check–dams Deposition in the Weathered Sandstone Watershed on the North Loess Plateau, China

Abstract: As the basic unit of erosion and sediment yield, it was critical to determine the amount of soil erosion and sediment yield in the small watersheds for sustaining a reasonable water resource and sediment regulation system. In this study, we determined the sediment yield from the dams‐controlled watershed on the North Loess Plateau. Three check dams in the watershed were investigated by drilling ten‐hole sedimentation cores. The corresponding flood couplets were dated according to thickness of deposition layers… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
28
1

Year Published

2017
2017
2022
2022

Publication Types

Select...
6
1
1

Relationship

1
7

Authors

Journals

citations
Cited by 61 publications
(29 citation statements)
references
References 80 publications
0
28
1
Order By: Relevance
“…Thus, a quality evaluation of these structures is needed to achieve more efficient use of resources with more sustainable results (Quiñonero et al, 2016), as they need to be placed in the best catchment location (Mekonnen et al, 2015) to exploit their full trap efficiency. For a better understanding of the role of check dams in trapping sediment, or to quantify the amount of sediment yield in their basins (Wei et al, 2016), retained sediment should be then measured using the most accurate methods. Given that a sound calculation of the volume depends on the accuracy of the topographic survey and the chosen method (Verstraeten & Poesen, 2002), the importance of the method and methodology employed are essential.…”
Section: Discussionmentioning
confidence: 99%
“…Thus, a quality evaluation of these structures is needed to achieve more efficient use of resources with more sustainable results (Quiñonero et al, 2016), as they need to be placed in the best catchment location (Mekonnen et al, 2015) to exploit their full trap efficiency. For a better understanding of the role of check dams in trapping sediment, or to quantify the amount of sediment yield in their basins (Wei et al, 2016), retained sediment should be then measured using the most accurate methods. Given that a sound calculation of the volume depends on the accuracy of the topographic survey and the chosen method (Verstraeten & Poesen, 2002), the importance of the method and methodology employed are essential.…”
Section: Discussionmentioning
confidence: 99%
“…The Suide site is characterized by a large number of artificial terraces of various types, which have a great effect on reducing the soil erosion [68]. In addition, the site also has a large number of check-dams, which also has a great effect on weakening soil erosion [69][70][71]. The check-dam intercepts a large amount of sediment from an upstream channel, and the slope in combination with the siltation of the check-dam, gradually forms a new equilibrium profile upstream, and elevates the erosion datum of its control site.…”
Section: Correlation Analysis With Other Geographical Agentsmentioning
confidence: 99%
“…The soil types are characterized by weathering sandstone, loess, and desert sand, and the land surface is dominated by dense gullies with poor vegetation cover (Wang et al ., ). In China, weathering sandstone (locally called pisha sandstone) is a general appellation for some types of fluvial clastic deposition sandstones and specifically refers to an interbedded rock consisting of Paleozoic Permian (approximately 2.5 hundred million years), Mesozoic Triassic, Jurassic and Cretaceous thick sandstone, sand shale and argillaceous sandstone (Ni et al ., ; Wei et al ., ). Although the area of pisha sandstone only accounts for 2.6% of the total Loess Plateau area, its coarse sediment yield accounts for 30% of the total coarse sediment in the upper–middle reaches of the Yellow River (Yang et al ., ).…”
Section: Methodsmentioning
confidence: 99%
“…Finally, the sediment deposition rate and sediment deposition yield were obtained from the sediment deposition thickness and the mass of the couplets divided by its controlled watershed area, respectively. More details of these methods were described in Wei et al (2017).…”
Section: Field Sampling and Measurementmentioning
confidence: 99%