2009
DOI: 10.2478/v10012-008-0040-6
|View full text |Cite
|
Sign up to set email alerts
|

Selected problems of determining an efficient operation standard in contemporary heat-and-flow diagnostics

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
7
0

Year Published

2011
2011
2025
2025

Publication Types

Select...
7
1

Relationship

2
6

Authors

Journals

citations
Cited by 9 publications
(8 citation statements)
references
References 1 publication
1
7
0
Order By: Relevance
“…Obtaining a diagnosis in the case of ANN enables all three phases of a diagnostic procedure to be found. ANN shows 97% efficiency and almost 100% identification accuracy in identifying degradation locations [42,49]. These results correspond with the site model with a multilayer perceptron, and a linear model of the unidirectional network should also be used for identification purposes.…”
Section: Literature Gapsupporting
confidence: 67%
“…Obtaining a diagnosis in the case of ANN enables all three phases of a diagnostic procedure to be found. ANN shows 97% efficiency and almost 100% identification accuracy in identifying degradation locations [42,49]. These results correspond with the site model with a multilayer perceptron, and a linear model of the unidirectional network should also be used for identification purposes.…”
Section: Literature Gapsupporting
confidence: 67%
“…Gate Cycle is designed for advanced combination systems, variable load operation 40-120% of nominal load [37]; • COM-GAS is intended for design level of combined systems with full analysis of a heat recovery steam generator, pulverized fuel, and fluidized bed boilers [38,39]; • DIAGAR is intended for design and diagnostic level of steam systems with full steam turbine analysis [40];…”
Section: Software For Zero-dimensional Modellingmentioning
confidence: 99%
“…This situation was the reason why the advantage of water control could not be uniquely evaluated, even based on warranty thermal measurements performed in steam turbine power plants [8,12]. In inland conditions this inability was checked on 200 MW blocks, where the gains calculated using the nomogrammes obtained from the producers and describing the operation of these apparatuses [7] were at the level of calculating errors.…”
Section: Economic and Technical Analysis Of The Use Of Cooling Water mentioning
confidence: 99%
“…The initial version of the diagnostic calculations performed for the thermal cycles of the inland and marine power plants had omitted cooling water system components [12]. For the purpose of the present analysis these components were included in the calculations, along with relevant data about their operation, which made it possible to calculate their energy parameters in changed operating conditions.…”
Section: Economic and Technical Analysis Of The Use Of Cooling Water mentioning
confidence: 99%
See 1 more Smart Citation