2009
DOI: 10.1587/transfun.e92.a.1764
|View full text |Cite
|
Sign up to set email alerts
|

Semi-Dynamic Multiprocessor Scheduling with an Asymptotically Optimal Performance Ratio

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
4
0

Year Published

2012
2012
2013
2013

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(4 citation statements)
references
References 13 publications
0
4
0
Order By: Relevance
“…The synchronization granularity, h, for the experiments was in the range of 100, 200, : : : , 3000 iterations. Next, the corresponding theoretical optimal synchronization granularity values were estimated using Equation (11), and these values were denoted by h t opt . To produce more accurate results, the experiments were repeated 10 times for each computational kernel, and the average of the actual parallel execution times is reported.…”
Section: Experimental Results Using the Gigabit Ethernet Interconnectmentioning
confidence: 99%
See 2 more Smart Citations
“…The synchronization granularity, h, for the experiments was in the range of 100, 200, : : : , 3000 iterations. Next, the corresponding theoretical optimal synchronization granularity values were estimated using Equation (11), and these values were denoted by h t opt . To produce more accurate results, the experiments were repeated 10 times for each computational kernel, and the average of the actual parallel execution times is reported.…”
Section: Experimental Results Using the Gigabit Ethernet Interconnectmentioning
confidence: 99%
“…These values are denoted by h p opt . Next, the corresponding theoretical optimal synchronization granularity values were estimated using Equation (11), and these values were denoted by h t opt . The theoretical and practical optimal synchronization granularity values are summarized in Table IV.…”
Section: Experimental Results Using the Gigabit Ethernet Interconnectmentioning
confidence: 99%
See 1 more Smart Citation
“…There are also results focusing on loops with dependencies [11]. Recent research results have been reported on loop self-scheduling methods for multi-core, graphics processing units, grids, and cloud systems [12], [13], [14], [15], [16], [17], [18], [19], [20], [21], [22], [23], [24], [25], [26] and [27].…”
Section: Introductionmentioning
confidence: 99%