For the purpose of reliability quantitative assessment of the surrounding rock of the deeply embedded karst tunnel and the geological body around the cavern in the case of the cavern in the forepart of the tunnel face, on the basis of the upper bound limit analysis method, the energy dissipation theory, as well as the reliability theory, the dimensionless performance function of each damage area of the deeply buried karst tunnels could be established in the case of the cavern in the front of the tunnel face. Subsequently, the probability of failure and the reliability index of each damage region of the deep–bedded karst tunnel in the case of the cavern in the front of this tunnel face should be calculated through the Monte Carlo simulation sampling approach. The investigation has demonstrated that the larger the cohesion of the geotechnical body and the larger the internal friction angle within the geotechnical body, the larger the reliability indexes of the geotechnical bodies around the tunnel. The larger the diameter of the cavern and the larger the tunnel burial depth, the greater the probability of failure in the left part of the geotechnical body around this cavern, and the smaller the reliability indexes of these damage areas.