1993
DOI: 10.1016/0377-2217(93)90025-i
|View full text |Cite
|
Sign up to set email alerts
|

Setup time reduction and competitive advantage in a closed manufacturing cell

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
21
0
1

Year Published

1996
1996
2021
2021

Publication Types

Select...
7
1
1

Relationship

0
9

Authors

Journals

citations
Cited by 35 publications
(23 citation statements)
references
References 8 publications
1
21
0
1
Order By: Relevance
“…Group 8) Finally, uncertainty in CMS problem can also be detected in products arrival time to cells. Classical models assume that all products are available at the beginning of the production planning while in real application we may have some cases where products arrive to cell with unknown time which could be studied using queuing theory [16]. The cases where a CMS is involved with cell formation integrated with scheduling ( [17], [18]), exceptional elements in CF ( [19], [20]), the implementation of meta-heuristics and heuristics to solve large-scale problems are more practical and appealing real-case problems ( [21], [22]).…”
Section: Published By Atlantis Pressmentioning
confidence: 99%
“…Group 8) Finally, uncertainty in CMS problem can also be detected in products arrival time to cells. Classical models assume that all products are available at the beginning of the production planning while in real application we may have some cases where products arrive to cell with unknown time which could be studied using queuing theory [16]. The cases where a CMS is involved with cell formation integrated with scheduling ( [17], [18]), exceptional elements in CF ( [19], [20]), the implementation of meta-heuristics and heuristics to solve large-scale problems are more practical and appealing real-case problems ( [21], [22]).…”
Section: Published By Atlantis Pressmentioning
confidence: 99%
“…In some finite-capacity loading models (Kekre, 1987;Banker, Datar, and Kekre, 1988;Karmarkar and Kekre, 1992;Yang and Deane, 1993;Matsuura, Tsubone, and Kanezashi 1996;Tielemans and Kuik, 1996), a production facility is modeled as a queuing system where the expected queuing delay serves as a performance measure. For a high level of utilization (i.e., high system load), the expected queuing delay dominates the expected total manufacturing stay-time (defined as queuing delay plus processing time).…”
Section: Finite-capacity Loading Of Production Systemsmentioning
confidence: 99%
“…The problems of the set-up time reduction in a production system have received considerable attention in recent years (Yang andDeane 1993, Leschke andWeiss 1997). In fact, Porteus (1985Porteus ( , 1986 initially provided a framework to analyse the set-up cost reduction.…”
Section: Literature Reviewmentioning
confidence: 99%