2019
DOI: 10.1016/j.resconrec.2019.02.020
|View full text |Cite
|
Sign up to set email alerts
|

Seven-dimensional automated construction waste quantification and management framework: Integration with project and site planning

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
39
0
3

Year Published

2019
2019
2023
2023

Publication Types

Select...
4
4
1

Relationship

0
9

Authors

Journals

citations
Cited by 60 publications
(42 citation statements)
references
References 44 publications
0
39
0
3
Order By: Relevance
“…Gurgun and Koc (2020) report that compliance to schedule requirements was topmost among clients' performance criteria in GCPs. However, it has been proven that projects adopting GCPs are often more susceptible to schedule overruns compared to conventional construction projects (Bakchan et al, 2019), thus impacting negatively on CS on green construction projects. In view of the leanings from the literature reviewed, it is hypothesized as follows: H1 GCPs has a negative signi cant effect on CS.…”
Section: Green Construction Practices and Client Satisfactionmentioning
confidence: 99%
“…Gurgun and Koc (2020) report that compliance to schedule requirements was topmost among clients' performance criteria in GCPs. However, it has been proven that projects adopting GCPs are often more susceptible to schedule overruns compared to conventional construction projects (Bakchan et al, 2019), thus impacting negatively on CS on green construction projects. In view of the leanings from the literature reviewed, it is hypothesized as follows: H1 GCPs has a negative signi cant effect on CS.…”
Section: Green Construction Practices and Client Satisfactionmentioning
confidence: 99%
“…A 4D tool based in the Industry Foundation Class (IFC) was also developed. Wang et al (2004) and Bakchan et al (2019) presented decision systems that focus on the flow of work and materials. Wang et al (2004) presented the 4D Site Management Model + (4DSMM +), a model that integrates 4D technology to resource management and site space utilization.…”
Section: Design and Modelingmentioning
confidence: 99%
“…This platform integrates dynamic resource management at the project level and decision-making support. Bakchan et al (2019) sought to outline the conceptual interactions that define the integration of construction waste management (CWM) and BIM with construction management. The authors proposed a multi-dimensional framework that provides guidance on CWM applications such as CW disposal scheduling, disposal cost estimation, on-site reuse, and allocation of waste bins.…”
Section: Design and Modelingmentioning
confidence: 99%
“…Meanwhile, few studies have investigated the quantity of waste generated at different construction stages. In recent years, building information modeling (BIM) was leveraged to estimate CW (Bakchan et al, 2019; Kim et al, 2017; Won et al, 2016). However, a database including the WGR, embedded in the BIM model, must be built first according to the aforementioned qualitative or quantitative methods.…”
Section: Introductionmentioning
confidence: 99%