Day 2 Wed, March 25, 2020 2020
DOI: 10.2118/199845-ms
|View full text |Cite
|
Sign up to set email alerts
|

Significant Time Reduction and Cost Savings Realized Through the Use of Wireline Deployed Milling Services, to Enlarge a Tubing Hanger

Abstract: A producing well located offshore Congo was equipped with a TRSCSSV which failed to open. A velocity valve, with a stem beneath, had been installed to keep the flapper open. This condition, apart from restricting the production, was a temporary solution as defined in Eni's (the operator) well integrity policy; for this reason, the SSV had to be replaced. In order to do so, the completion needed to be removed, which implied cutting the cut-to-release packer. A lock open tool needed to be run in the SSV to allow… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 0 publications
0
0
0
Order By: Relevance