2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM) 2018
DOI: 10.1109/ieem.2018.8607455
|View full text |Cite
|
Sign up to set email alerts
|

Simple and Cost Effective System for Overall Equipment Efficiency Measurement

Abstract: Today's business environment and intense competition drives organizations to find improved and more efficient ways to develop their production. For many manufacturers one of the key challenges is to find the bottle necks of the current production line. Overall Equipment Efficiency measurement can be used to find these, but the available solutions are usually expensive and specialized equipment. The purpose of this paper is to demonstrate how hobbyist level electronics and very cost-effective solutions can succ… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 8 publications
0
2
0
Order By: Relevance
“…Assessing the utilization of the existing capacity is a key component to increase production capabilities in manufacturing facilities [8]. Overall Equipment effectiveness (OEE) is a metric and a tool in Total Productive Maintenance (TPM), which is used to maximize equipment effectiveness [9] [10]. OEE represents the machine or production line efficiency.…”
Section: Overall Equipment Effectiveness (Oee)mentioning
confidence: 99%
See 1 more Smart Citation
“…Assessing the utilization of the existing capacity is a key component to increase production capabilities in manufacturing facilities [8]. Overall Equipment effectiveness (OEE) is a metric and a tool in Total Productive Maintenance (TPM), which is used to maximize equipment effectiveness [9] [10]. OEE represents the machine or production line efficiency.…”
Section: Overall Equipment Effectiveness (Oee)mentioning
confidence: 99%
“…Production Time (PT) = Shift length -Breaks -Planned stops -Services [10] Quality = [10] OEE describes a value but when it is counted machine by machine there will be different kinds of losses encountered and more details about those losses can be studied further to improve the efficiency and effectiveness of the system [9] [10].…”
Section: Oee =mentioning
confidence: 99%