“…The obtained solution is then compared with the one obtained in the previous section. The turbine sets assigned to substations 0 1 and 0 2 are, respectively, N 1 = {1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13} and N 2 = {14, 15,16,17,18,19,20,21,22,23,24,25,26,27,28,29,30,31,32,33,34,35,36,37,38,39,40,41,42,43,44,45,46,47,48, 49, 50}. The obtained objective value corresponds to the cost EUR 4,800,839.0.…”