2020
DOI: 10.1016/j.ijepes.2019.105476
|View full text |Cite
|
Sign up to set email alerts
|

Simulation-based assessment of the installation of a Reversible Substation in a railway line, including a realistic model of large traffic perturbations

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
6
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
4
2
1

Relationship

1
6

Authors

Journals

citations
Cited by 8 publications
(6 citation statements)
references
References 33 publications
0
6
0
Order By: Relevance
“…As previously stated, the optimization algorithms need information from the railway simulations in order to compute the fitness function. The description of the railway simulator used in this research is out of the scope of this paper, but it must be noted that it thoroughly detailed in [16,17,38], both from the traffic and electrical modeling points of view. The traffic modeling and simulation include use of different headways for the different time bands (the headway being the time interval between consecutive trains), use of different Automatic Train Operation (ATO) speed profiles, variability in the dwell times of the short-turn and terminal stations, use of realistic dwell times in passenger stations obtained from stochastic models and implementation of a centralized traffic regulation model that automatically manages traffic operation on metro lines.…”
Section: Middleware Between Optimization Algorithms and Railway Simul...mentioning
confidence: 99%
See 2 more Smart Citations
“…As previously stated, the optimization algorithms need information from the railway simulations in order to compute the fitness function. The description of the railway simulator used in this research is out of the scope of this paper, but it must be noted that it thoroughly detailed in [16,17,38], both from the traffic and electrical modeling points of view. The traffic modeling and simulation include use of different headways for the different time bands (the headway being the time interval between consecutive trains), use of different Automatic Train Operation (ATO) speed profiles, variability in the dwell times of the short-turn and terminal stations, use of realistic dwell times in passenger stations obtained from stochastic models and implementation of a centralized traffic regulation model that automatically manages traffic operation on metro lines.…”
Section: Middleware Between Optimization Algorithms and Railway Simul...mentioning
confidence: 99%
“…The traffic modeling and simulation include use of different headways for the different time bands (the headway being the time interval between consecutive trains), use of different Automatic Train Operation (ATO) speed profiles, variability in the dwell times of the short-turn and terminal stations, use of realistic dwell times in passenger stations obtained from stochastic models and implementation of a centralized traffic regulation model that automatically manages traffic operation on metro lines. For more details about the traffic models implemented in the simulator, see [16,17].…”
Section: Middleware Between Optimization Algorithms and Railway Simul...mentioning
confidence: 99%
See 1 more Smart Citation
“…to connect DC -AC inverter in parallel with the unidirectional power supply rectifier circuit so that the regenerative braking energy could be fed directly to the AC grid as shown in Fig. 2 [5], [6], [19], [31]- [37]. This method is called reversible or inverting substation.…”
Section: Energy Storage Systemmentioning
confidence: 99%
“…to connect DC -AC inverter in parallel with the unidirectional power supply rectifier circuit so that the regenerative braking energy could be fed directly to the AC grid as shown in Fig. 2 [5], [6], [19], [31]- [37]. This method is called reversible or inverting substation.…”
Section: Energy Storage Systemmentioning
confidence: 99%