Simulation-based dimensioning of manufacturing process chains

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
2
0
1

Year Published

2014
2014
2023
2023

Publication Types

Select...
6
1

Relationship

1
6

Authors

Journals

citations
Cited by 21 publications
(3 citation statements)
references
References 2 publications
0
2
0
1
Order By: Relevance
“…In each process pair, the output of the first process becomes the input of the second one, which creates complex interdependencies that define the so-called technological interface between the component technologies. 38,39 By implementing the concept of technological interfaces between two consecutive processes, a link between the processes is established, and the effect of their combined set of capability parameters on the performance of a process pair can be modelled and assessed. Thus, at the technology level, the interfaces between component manufacturing technologies in such process chains are systematically analysed in order to assess both their individual and combined capabilities and also their compatibility and complementarity.…”
Section: Methodsmentioning
confidence: 99%
“…In each process pair, the output of the first process becomes the input of the second one, which creates complex interdependencies that define the so-called technological interface between the component technologies. 38,39 By implementing the concept of technological interfaces between two consecutive processes, a link between the processes is established, and the effect of their combined set of capability parameters on the performance of a process pair can be modelled and assessed. Thus, at the technology level, the interfaces between component manufacturing technologies in such process chains are systematically analysed in order to assess both their individual and combined capabilities and also their compatibility and complementarity.…”
Section: Methodsmentioning
confidence: 99%
“…Bei direkten Zusammenhängen wirkt sich die Prozessanpassung auf den unmittelbaren Folgeprozess aus, bei indirekten erst auf spätere Prozesse [1]. Eine Planung von Einzelprozessen ohne Berücksichtigung der Wirkbeziehungen kann folglich dazu führen, dass nur lokale Verbesserungen erzielt werden, für die Gesamtprozesskette jedoch kein positiver Effekt eintritt [2].…”
Section: Einführungunclassified
“…However, it is important to note that most approaches focus on the optimisation of single processes without considering potential interdependencies with subsequent processes. As Denkena et al [17] state, it is questionable whether a singleprocess oriented optimisation results in a global optimum. In contrast to single-process oriented optimisation approaches, a holistic process chain optimisation considers all processes of the process chain as well as their interactions.…”
Section: State Of the Artmentioning
confidence: 99%