Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
54
0

Year Published

2013
2013
2021
2021

Publication Types

Select...
5
5

Relationship

0
10

Authors

Journals

citations
Cited by 124 publications
(54 citation statements)
references
References 47 publications
0
54
0
Order By: Relevance
“…They considered the problem of determining optimum due dates and processing sequence concurrently to minimize costs of earliness, due date assignment and weighted number of tardy jobs. (Vinod & Sridharan, 2011) studied due date assignment rules and scheduling methods in a dynamic job shop environment. As a due date assignment method they used PWW, TWK, DTWK (Dynamic Total Work Content), RWK (Random Work Content) and as a scheduling rules they used seven different types of rules.…”
Section: Background and Related Researchesmentioning
confidence: 99%
“…They considered the problem of determining optimum due dates and processing sequence concurrently to minimize costs of earliness, due date assignment and weighted number of tardy jobs. (Vinod & Sridharan, 2011) studied due date assignment rules and scheduling methods in a dynamic job shop environment. As a due date assignment method they used PWW, TWK, DTWK (Dynamic Total Work Content), RWK (Random Work Content) and as a scheduling rules they used seven different types of rules.…”
Section: Background and Related Researchesmentioning
confidence: 99%
“…Its major advantage is that it does not consume material, energy and resources, it only requires data. Thus, different variants of production are tested in advance as we search for an optimal solution [10,11].  Tabu-search (TS), which is one of the most commonly used metaheuristics in combinatorial optimization problems.…”
Section:  Departure Of the Ordersmentioning
confidence: 99%
“…Moreover, the calculation of due dates in ETO environments is relatively mistreated. Most studies focus on static problem instances where jobs do not arrive continuously in the system [46], or require significant modelling efforts [53] and simulation experiments [54], which are rarely feasible in actual daily practice for due-date calculation.…”
Section: Order Due-date Assignmentmentioning
confidence: 99%