“…22 The DNBFs were operated in a downflow mode, and the hydraulic retention time (HRT) was set at 8, 5, and 3 h, respectively, concerning the existing research. 23,24 The DNBFs were first inoculated with activated sludge (3800 mg/L MLSS) collected from an anoxic tank at a municipal wastewater treatment plant in Nanjing, China, for 24 h. Then, the synthetic wastewater was directly pumped into the DNBF for W, while it was pretreated by UV/PAA for G. Synthetic wastewater with a C/N of 2 (COD and NO 3 − −N of 50 and 25 mg/L, respectively) was employed, with the components of wastewater shown in Table S1 in the Supporting Information (SI), referring to the previous studies 24,25 and the concentration of the actual tailwater from a wastewater treatment plant in Nanjing, Jiangsu province (China). E1 (purity >99%), E2 (>99%), and E3 (>99%) were purchased from Aladdin, Shanghai, China.…”