Initial Reports of the Deep Sea Drilling Project 1987
DOI: 10.2973/dsdp.proc.94.105.1987
|View full text |Cite
|
Sign up to set email alerts
|

Site 609

Abstract: SITE 609Core recovery (%): 52 Oldest sediment cored:Sub-bottom depth (m): 190. 49°52.7'N, 24° 14.3 'W, at a water depth of 3884 m. Four holes were drilled at the site, three of which yielded sections of significant length; two cores were taken from the fourth during the process of feeling for bottom. Hole 609 was cored with the hydraulic piston corer (HPC) to a sub-bottom depth of 130.6 m (1.9 Ma) and then cored with the extended core barrel (XCB) to 399.4 m (7.0 Ma). Hole 609B was cored with the variable-le… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 17 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?