2020
DOI: 10.36688/imej.3.101-110
|View full text |Cite
|
Sign up to set email alerts
|

Site selection for scaled open water testing of a wave energy converter

Abstract: Many wave energy converter developers opt to carry out scaled prototype open water testing of their device as part of their technology development. Developers who have done this recently include Sea Power (1/5 scale, Galway Bay, 2017), CorPower (1/4 scale, EMEC, 2018) and Marine Power Systems (1/4 scale, FaBTest, ongoing). Scaled open water testing offers several benefits, including more representative realisations of sub-systems, identification and resolution of technological issues associated with scaling-up… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
4
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(4 citation statements)
references
References 4 publications
0
4
0
Order By: Relevance
“…When technology starts to reach a higher level of maturity, testing a prototype at sea is then required. The process to determine an appropriate open water site for a scaled device is not straightforward and detailed analysis of both the commercial deployment site and the scale test site is required Mclean et al (2019).…”
Section: Wave Energy Converter Site Characterisationmentioning
confidence: 99%
See 1 more Smart Citation
“…When technology starts to reach a higher level of maturity, testing a prototype at sea is then required. The process to determine an appropriate open water site for a scaled device is not straightforward and detailed analysis of both the commercial deployment site and the scale test site is required Mclean et al (2019).…”
Section: Wave Energy Converter Site Characterisationmentioning
confidence: 99%
“…Regardless of the feature of the wave resource being exploited by the WEC, accurate representation of that resource is required. Seasonal and annual variations at a site can be significant Perignon (2017), Mclean et al (2019) so extensive knowledge of a deployment site is important at a number of stages throughout the development of a WEC and a commercial project. During design phases it is important to understand the wave conditions and how this will impact on the device motions and loads within individual components.…”
Section: Wave Energy Converter Site Characterisationmentioning
confidence: 99%
“…When technology starts to reach a higher level of maturity it is required to test a prototype at sea, and this is often undertaken at a scale which is smaller than the expected commercial device. The process to determine an appropriate open water site for a scaled device is not straightforward and detailed analysis of both the commercial deployment site and the scale test site is required Mclean et al (2019).…”
Section: Wave Energy Converter Site Characterisationmentioning
confidence: 99%
“…Others apply additional criteria to identify suitable sites for both land-based [7][8][9] and offshore [10,11] renewable energy infrastructure. Many studies have adopted various criteria and methods to conduct on-site identification for ORE in recent years [12][13][14][15], including for wave energy [16][17][18] and tidal energy [19][20][21]. However, a thorough multi-criteria site suitability analysis for wave and tidal energy for the region of interest (see Section 2.1) is lacking.…”
Section: Introductionmentioning
confidence: 99%