2017
DOI: 10.1007/978-981-10-5699-4_6
|View full text |Cite
|
Sign up to set email alerts
|

Software Cost Estimation Using Artificial Neural Network

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(2 citation statements)
references
References 8 publications
0
2
0
Order By: Relevance
“…Boehm et al 20 were the first to propose a well‐known model called the COCOMO for predicting software cost‐effectively and a total of 63 projects is used to validate the model's effectiveness. Over the last three decades, lots of new SCE models based on algorithmic, soft computing, machine learning, and meta‐heuristic techniques have been proposed 6,21‐25 . Benala et al 26 introduced an approach based on DE with five mutation strategies.…”
Section: Background Methods and Software Cost Estimationmentioning
confidence: 99%
“…Boehm et al 20 were the first to propose a well‐known model called the COCOMO for predicting software cost‐effectively and a total of 63 projects is used to validate the model's effectiveness. Over the last three decades, lots of new SCE models based on algorithmic, soft computing, machine learning, and meta‐heuristic techniques have been proposed 6,21‐25 . Benala et al 26 introduced an approach based on DE with five mutation strategies.…”
Section: Background Methods and Software Cost Estimationmentioning
confidence: 99%
“…Pospieszny et al [31], Mensah et al [26], Puspaningrum and Sarno [32], Moosavi and Bardsiri [27], Wani and Quadri [40], Arora and Mishra [3], Abnane et al [1], and Khuat and Le [20] respectively employed a linear method integrated with neural networks, multivariate regression model, artificial neural networks integrated with the harmony algorithm, neural networks integrated with the fuzzy method, neural networks, the fuzzy model and the artificial bee colony algorithm for software development cost estimation.…”
Section: Introductionmentioning
confidence: 99%