2017
DOI: 10.1016/j.asoc.2017.09.003
|View full text |Cite
|
Sign up to set email alerts
|

Solving an extended multi-row facility layout problem with fuzzy clearances using GA

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
18
0
1

Year Published

2019
2019
2025
2025

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 45 publications
(19 citation statements)
references
References 45 publications
0
18
0
1
Order By: Relevance
“…Heuristic algorithms were proposed in [18], and a nonlinear formulation was given in [16] and solved using a genetic algorithm (GA). A GA was also proposed by [31] but they do not enforce the strict row structure as we do here. An SDPbased approach was introduced in [24], and to the best of our knowledge, this is the only global optimization approach for the general row FLP with more than two rows.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Heuristic algorithms were proposed in [18], and a nonlinear formulation was given in [16] and solved using a genetic algorithm (GA). A GA was also proposed by [31] but they do not enforce the strict row structure as we do here. An SDPbased approach was introduced in [24], and to the best of our knowledge, this is the only global optimization approach for the general row FLP with more than two rows.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The in-plant supply of manufacturing processes is based on complex material handling systems, which were optimized with a hybrid multi-objective artificial immune systems-based algorithm [42]. Manufacturing processes are typical uncertain environments, where fuzzy modelling and fuzzy optimization offers suitable tools [43,44] and the fuzzy approach can easily integrate with other analytical or heuristic algorithms [45]. Researchers used an integrated data-driven stochastic degradation model to find the optimal maintenance strategy in chemical and manufacturing processes, where unit failures are caused due to equipment degradation [46].…”
Section: Content Analysismentioning
confidence: 99%
“…S [15,20,25], [3,5,7] 960.18 RL [10,20,20], [2,5,5] 731.57 RR [20,20,30], [5,5,8] 1,234.52 SL [13,20,23], [2,5,7] 884.74 SR [17,20,27], [3,5,8] 1,067.63 a. Crisp number Figure 6: The relationship between various fuzzy data sets and the total cost.…”
Section: %mentioning
confidence: 99%
“…These factors are also time-dependent, such as customer orders and product growth, so the cost of material handling between machines usually changes. Different methods [9][10][11][12] have been presented for solving these kinds of problems; however, uncertain and ambiguous data inputs have been paid little attention [13]. Therefore, the fuzzy set theory is applied in this paper.…”
Section: Introductionmentioning
confidence: 99%