2015
DOI: 10.1007/s00170-015-8069-z
|View full text |Cite
|
Sign up to set email alerts
|

Solving and optimizing a bi-objective open shop scheduling problem by a modified genetic algorithm

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
7
0
2

Year Published

2016
2016
2021
2021

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 19 publications
(9 citation statements)
references
References 25 publications
0
7
0
2
Order By: Relevance
“…Lastly, the scheduling problems which is the most discussed category of MOCOPs consists of open shop scheduling problem [125], [126], job shop scheduling problem (JSSP) [127], [128], [129], [130], [131], [132], FSP [133], [134], [135], [136], [137], [138], project scheduling problem (PSP) [139], resource constrained PSP (RCPSP) [140], [141], [142], [143], [144], [145], timetabling problem [146], cross-docking scheduling problem [147], task scheduling problem [148], [149], [150], [151], [152], [153], [154], machine scheduling problem [155], [156], [157], [158], [159], [160], [161], satellite range scheduling problem [162], multi-objective satellite data transmission scheduling problem [163], satellite scheduling of large areal tasks [164], operating room scheduling [165], [166], harvest scheduling problem [167], energy-efficiency scheduling problem…”
Section: A Nsga-ii For Mocopsmentioning
confidence: 99%
See 2 more Smart Citations
“…Lastly, the scheduling problems which is the most discussed category of MOCOPs consists of open shop scheduling problem [125], [126], job shop scheduling problem (JSSP) [127], [128], [129], [130], [131], [132], FSP [133], [134], [135], [136], [137], [138], project scheduling problem (PSP) [139], resource constrained PSP (RCPSP) [140], [141], [142], [143], [144], [145], timetabling problem [146], cross-docking scheduling problem [147], task scheduling problem [148], [149], [150], [151], [152], [153], [154], machine scheduling problem [155], [156], [157], [158], [159], [160], [161], satellite range scheduling problem [162], multi-objective satellite data transmission scheduling problem [163], satellite scheduling of large areal tasks [164], operating room scheduling [165], [166], harvest scheduling problem [167], energy-efficiency scheduling problem…”
Section: A Nsga-ii For Mocopsmentioning
confidence: 99%
“…The proposed approach has better convergence and solution quality as compared to the classical NSGA-II. Real-world TTSP Experiment & a TTSP for 2 units under test UUTs GA, Genetic simulated annealing algorithm (GASA) [141] iMOPSE Benchmark Dataset 5 DEGR, NSGA-II [136] Standard benchmark instances 6 NSGA-II [139] Problem instances from (PSPLIB) 7 AUGMECON2, MOPSO [151] Experiment NSGA-II, NSPSO [177] Test Instances generated through RaGEN software ECM [126] Randomly Generated AUGMECON [181] -NSGA-II [155] Experiment conducted through randomly generated data NSGA-II & SPEA-II [184] Simulation Scenario RANDOM, FIRMM [189] Experimental test NSGA-II [144] -- [127] Modified Deterministic FJSPs into Stochastic Problems NRGA [188] Randomly Generated Controlled elitist NSGA, NSGA-II [125] Test [193] -- [147] Randomly Generated Numerical example MOPSO [191] Randomly Generated - [183] -GA [161] Randomly generated instances for unrelated parallel machine - [195] -- [212] Randomly Generated SPEA [203] Sample test problems ECM [202] Sample test problems MOPSO [200] Randomly Generated NSDE [204] Randomly Generated Greedy Method, ISA, ISA-LOCAL [196] CAB & AP datasets 10 AUGMECON [209] -- [206] Randomly Generated Weighted Metric Approach [207] -ECM, Multi-objective simulated annealing (MOSA) [198] Randomly Generated SSPMO, WSM & ECM…”
Section: E) Scheduling Problemmentioning
confidence: 99%
See 1 more Smart Citation
“…En la literatura de corriente principal ((Azadeh et al, 2016), (Geng et al, 2018), (Kaplanoğlu, 2016), (Robaninejat et al, 2016), (Shivasankaran, 2015), (Yan y Yue, 2015)) y sus antecedentes, se observa que los procesos de investigación en sistemas "Job Shop", se han orientado prioritariamente hacia la incorporación de diversidad de variables, las cuales se encuentran relacionadas con el campo de la eficiencia técnica. De esta forma, se pretende explicar y mejorar el desempeño económico de tal clase de sistema productivo.…”
Section: 5 -546unclassified
“…En este sentido, la revisión de la literatura de corriente principal, permite discriminar las siguientes categorías, en el campo de la programación multiobjetivo de los sistemas "Job Shop": Evaluación de eficiencia en cuánto a asignación de carga de trabajo. Para el caso, se relacionan entre otros, 6 desarrollos, los cuales buscan minimizar el comportamiento de las variables: tiempo de proceso, total de carga de trabajo y total de carga de trabajo en la operación crítica ((Azadeh et al, 2016), (Huang y Süer, 2015), (Kaplanoglu, 2016), (Ojstersek et al, 2018), (Pérez y Hernández, 2018), (Zhu et al, 2016)).…”
unclassified