2019
DOI: 10.1155/2019/1572614
|View full text |Cite
|
Sign up to set email alerts
|

Solving Integrated Process Planning, Dynamic Scheduling, and Due Date Assignment Using Metaheuristic Algorithms

Abstract: Because the alternative process plans have significant contributions to the production efficiency of a manufacturing system, researchers have studied the integration of manufacturing functions, which can be divided into two groups, namely, integrated process planning and scheduling (IPPS) and scheduling with due date assignment (SWDDA). Although IPPS and SWDDA are well-known and solved problems in the literature, there are limited works on integration of process planning, scheduling, and due date assignment (I… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
6
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
6
2

Relationship

3
5

Authors

Journals

citations
Cited by 13 publications
(6 citation statements)
references
References 119 publications
0
6
0
Order By: Relevance
“…Because of its robustness and flexibility, GAs are the most widely used technique for assembly-line optimization. [19][20][21] GA-based process optimization has long been studied using machine learning techniques. 22 Cheshmehgaz et al analyzed the relocation of cellular personnel using a GA. 23 Li et al proposed an active learning GA. 24 Barathwaj et al considered the application of a GA for reducing the number of workers in mixed-model assembly lines.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…Because of its robustness and flexibility, GAs are the most widely used technique for assembly-line optimization. [19][20][21] GA-based process optimization has long been studied using machine learning techniques. 22 Cheshmehgaz et al analyzed the relocation of cellular personnel using a GA. 23 Li et al proposed an active learning GA. 24 Barathwaj et al considered the application of a GA for reducing the number of workers in mixed-model assembly lines.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The method proposed in this study includes a genetic algorithm (GA) as an optimization technique. Because of its robustness and flexibility, GAs are the most widely used technique for assembly‐line optimization 19–21 . GA‐based process optimization has long been studied using machine learning techniques 22 .…”
Section: Literature Reviewmentioning
confidence: 99%
“…Demir and Erden (2020) tried to optimize the dynamic environment with ant colony algorithm in their work. DIPPSDDA, which was previously improved with the genetic algorithm and some metaheuristic algorithms (Erden et al, 2019), was a new field of study.…”
Section: Background and Literature Surveymentioning
confidence: 99%
“…Following works can be given as studies on Scheduling With Due-Window Assignment (SWDWA) problem; and Yang et al [17]. Some of the works on the IPPSDDA problem can be given as Demir and Taskin [18], Demir and Erden [19]- [21], [21], [22].…”
Section: Introductionmentioning
confidence: 99%