2019
DOI: 10.1016/j.ejor.2018.07.008
|View full text |Cite
|
Sign up to set email alerts
|

Solving the Weighted Capacitated Planned Maintenance Problem and its variants

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(1 citation statement)
references
References 22 publications
0
0
0
Order By: Relevance
“…However, because maintenance activities require the machine to stop for a period of time, they should be scheduled in accordance with the production planning to avoid impeding the production system's ability to meet its production targets [6]. Study about weighted capacitated planned maintenance by considering perioddependent predetermined time limitations for the scheduled maintenance activities has been carried out by [7]. The objective of that study is to minimise fixed and variable maintenance costs with a feasible schedule.…”
Section: Related Workmentioning
confidence: 99%
“…However, because maintenance activities require the machine to stop for a period of time, they should be scheduled in accordance with the production planning to avoid impeding the production system's ability to meet its production targets [6]. Study about weighted capacitated planned maintenance by considering perioddependent predetermined time limitations for the scheduled maintenance activities has been carried out by [7]. The objective of that study is to minimise fixed and variable maintenance costs with a feasible schedule.…”
Section: Related Workmentioning
confidence: 99%