2022
DOI: 10.1007/s12205-022-1404-7
|View full text |Cite
|
Sign up to set email alerts
|

Spatio-temporal Changes in Downstream River Bed during a Dam Construction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 31 publications
0
1
0
Order By: Relevance
“…By using the real point data obtained with the manual measurements and by applying the kriging interpolation method, a DEM was derived with a spatial resolution of 0.01 m (Figure 7). Other studies also use Geodetic data for measurements or references [103][104][105].…”
Section: The Gnss Surveymentioning
confidence: 99%
“…By using the real point data obtained with the manual measurements and by applying the kriging interpolation method, a DEM was derived with a spatial resolution of 0.01 m (Figure 7). Other studies also use Geodetic data for measurements or references [103][104][105].…”
Section: The Gnss Surveymentioning
confidence: 99%