Proceedings of SPE International Conference on Oilfield Scale 2010
DOI: 10.2523/129765-ms
|View full text |Cite
|
Sign up to set email alerts
|

Squeeze Related Well Productivity Impairment Mechanisms & Preventative/Remedial Measures Utilised: Norwegian Continental Shelf

Abstract: Squeezing is routinely employed by Statoil as a means of maintaining well productivity and avoiding safety issues related to downhole safety valve scaling. In the majority of cases, squeezing maintains well production through minimisation of scale related downtime. However, it has been observed occasionally by Statoil that the benefits of scale prevention by squeezing can be outweighed by the detrimental impact on well productivity. While there have been several articles covering specific elements of a squeeze… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
3
0

Year Published

2010
2010
2016
2016

Publication Types

Select...
2
1

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 15 publications
0
3
0
Order By: Relevance
“…Although many approaches have been adopted for performance evaluation in the various industry sectors such as software industry, manufacturing industry, and even the construction industry (Bang et al 2010;Benestad et al 2009; de Aquino, de Lemos Meira 2009;Fleming et al 2010;Issa et al 2009;Niu, Dartnall 2010;Ren 2009;Yang, Paradi 2009), there are limited suitable approaches for the development of a project level engineering productivity metric. The Project-Level Productivity (PLP) index was developed by Ellis and Lee (2006) for monitoring multidiscipline daily labor productivity.…”
Section: Historical Background and Development Of The Pepmmentioning
confidence: 99%
“…Although many approaches have been adopted for performance evaluation in the various industry sectors such as software industry, manufacturing industry, and even the construction industry (Bang et al 2010;Benestad et al 2009; de Aquino, de Lemos Meira 2009;Fleming et al 2010;Issa et al 2009;Niu, Dartnall 2010;Ren 2009;Yang, Paradi 2009), there are limited suitable approaches for the development of a project level engineering productivity metric. The Project-Level Productivity (PLP) index was developed by Ellis and Lee (2006) for monitoring multidiscipline daily labor productivity.…”
Section: Historical Background and Development Of The Pepmmentioning
confidence: 99%
“…Well A-19B is another commingled production well at Veslefrikk that has proven to have a severe scaling potential (Fleming et al, 2010). Two MRTs performed in February and July 2008 have been analysed, and are presented below.…”
Section: Field Example #2 A-19bmentioning
confidence: 99%
“…Later coiled tubing milling was performed. The mill got stuck, and the well was shut in for side tracking (Fleming et al, 2010).…”
mentioning
confidence: 99%