2019
DOI: 10.36487/acg_rep/1915_21_pakula
|View full text |Cite
|
Sign up to set email alerts
|

Stabilising an underground void: monolithic construction using self-consolidating concrete

Abstract: In 2007, during a planned water level raise at the Giant Mine, which had recently been placed into care and maintenance, a large movement of fill occurred in a series of connected vertically stacked cut-and-fill stopes. The movement mobilised over 170,000 metric tonnes of previously placed unconsolidated rock and sand fill and left a 70,000 m 3 void separated from arsenic trioxide storage vaults, by a thin sill pillar. Review of historical mine plans and investigations onsite suggested that timber sill mats an… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 1 publication
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?