Stability Analysis and Control Technology of Gob-Side Entry Retaining with Double Roadways by Filling with High-Water Material in Gently inclined Coal Seam

Abstract: Roadside filling body in traditional gob-side entry retaining (GER) has several shortcomings such as the insufficient support resistance, the inability to adapt to the deformation of surrounding rock and isolate the goaf effectively. Taking the GER with double roadways by filling with 1.8-m-wide high-water material in gently inclined coal seam of Zuozegou mine as a project case, the mechanical model of GER with double roadways in the gently inclined coal seam is constructed, and the reasonable width of the fil… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 21 publications
0
1
0
Order By: Relevance
“…On the basis of the difficulties in roadway support and support principles, 23‐29 in view of the large area roof fall disaster of the broken surrounding rock of No. 11103 fully mechanized caving roadway under the double gob, the U‐steel + anchor + prop coupling support structure is used to bear the broken surrounding rock, resist the top pressure, and prevent the U‐shaped steel from appearing weak section under the eccentric load conditions of coal pillar stress concentration and gob stress reduction, which reduces the bearing capacity 30‐37 . “U‐steel + anchor + prop” refers to U‐shaped steel shed, hollow grouting anchor cable and single prop.…”
Section: Surrounding Rock Control Techniquesmentioning
confidence: 99%
“…On the basis of the difficulties in roadway support and support principles, 23‐29 in view of the large area roof fall disaster of the broken surrounding rock of No. 11103 fully mechanized caving roadway under the double gob, the U‐steel + anchor + prop coupling support structure is used to bear the broken surrounding rock, resist the top pressure, and prevent the U‐shaped steel from appearing weak section under the eccentric load conditions of coal pillar stress concentration and gob stress reduction, which reduces the bearing capacity 30‐37 . “U‐steel + anchor + prop” refers to U‐shaped steel shed, hollow grouting anchor cable and single prop.…”
Section: Surrounding Rock Control Techniquesmentioning