1970
DOI: 10.3126/bdg.v10i0.1419
|View full text |Cite
|
Sign up to set email alerts
|

Stability and stress analyses of headrace tunnel, Upper Seti Storage Hydroelectric Project, Western Nepal

Abstract: The Upper Seti (Damauli) Storage Hydroelectric Project has a capacity of 128 MW, the storage type scheme, and includes 1000 m long horse shoe headrace tunnel, 140 m high concrete gravity dam, two diversion tunnels of lengths 712 m and 881 m and an underground powerhouse. The study was carried out to identify stability and stress conditions for the headrace tunnel to suggest the required tunnel support. The project area extensively covers dolomite and minorly covers slate. The rock mass classification showed fa… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 1 publication
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?