Day 4 Thu, May 16, 2019 2019
DOI: 10.2118/194407-ms
|View full text |Cite
|
Sign up to set email alerts
|

Starting Up the Most Powerful ESP Installed into Deepwater Offshore Wells Completed with Open Hole Gravel Packing: A Real Challenge

Abstract: Atlanta Field, offshore Brazil, is probably the most challenging deep-water heavy oil field in the world. Great challenges have been overcome to build and test the first two wells in this field which have already been detailed elsewhere (Papers OTC 25813, SPE 174893, SPE 174896, SPE 174897, SPE 173946). The refurbishment of the FPSO Petrojarl I, to enable it to process the high viscous oil will be described elsewhere. Finally, the last frontier to prove the technical and economic viability of At… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 12 publications
0
1
0
Order By: Relevance
“…[3] This time window where no intervention is necessary is called the no-touch time, which has to be carefully estimated. [1,4,5] However, the evaluation of the no-touch time requires knowledge of the transient behaviour of the temperature field in the production fluids in the whole line, which cool down by natural convection, which depends on the fluid properties and pipeline thermal insulation. [6,7] There are some mature technologies in the industry for flow assurance, such as thermal insulation, direct electric heating, injection of chemical inhibitors, and the displacement of the production fluids by dead or diesel oil.…”
Section: Introductionmentioning
confidence: 99%
“…[3] This time window where no intervention is necessary is called the no-touch time, which has to be carefully estimated. [1,4,5] However, the evaluation of the no-touch time requires knowledge of the transient behaviour of the temperature field in the production fluids in the whole line, which cool down by natural convection, which depends on the fluid properties and pipeline thermal insulation. [6,7] There are some mature technologies in the industry for flow assurance, such as thermal insulation, direct electric heating, injection of chemical inhibitors, and the displacement of the production fluids by dead or diesel oil.…”
Section: Introductionmentioning
confidence: 99%