2015
DOI: 10.1134/s1063779615020033
|View full text |Cite
|
Sign up to set email alerts
|

Status and recent results of the BAIKAL-GVD project

Abstract: 2013 and successfully operated up to February 2014. We review the prototyping phase of the BAIKAL-GVD project and describe the conˇguration and design of the 2013 engineering array.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
18
0
1

Year Published

2015
2015
2024
2024

Publication Types

Select...
9
1

Relationship

3
7

Authors

Journals

citations
Cited by 24 publications
(19 citation statements)
references
References 20 publications
0
18
0
1
Order By: Relevance
“…However, DUMAND paved the way for later efforts by pioneering many of the detector technologies in use today and by inspiring the deployment of a smaller instrument in Lake Baikal [5]. A similar instrument, ANTARES, has been operating in the Mediterranean Sea for over a decade [6,7,8], leading the way for the ongoing construction of KM3NeT [9] off the coasts of Sicily (ARCA) and France (ORCA) and GVD [10] in Lake Baikal.…”
mentioning
confidence: 99%
“…However, DUMAND paved the way for later efforts by pioneering many of the detector technologies in use today and by inspiring the deployment of a smaller instrument in Lake Baikal [5]. A similar instrument, ANTARES, has been operating in the Mediterranean Sea for over a decade [6,7,8], leading the way for the ongoing construction of KM3NeT [9] off the coasts of Sicily (ARCA) and France (ORCA) and GVD [10] in Lake Baikal.…”
mentioning
confidence: 99%
“…The Baikal-GVD project is a logical extension of the research and development work performed on the last several years by the Baikal Collaboration [1,2,3,4,5,6]. The detection of highenergy neutrinos has been demonstrated with the NT200 telescope.…”
Section: Introductionmentioning
confidence: 99%
“…The next important step in the realization of the GVD project was made in 2013 by deployment of an enlarged engineering array -the first stage of the first GVD-cluster, which comprised 72 OMs arranged on three 345 m long strings and operated from April 2013 to February 2014 [1,7]. In 2014 the second stage of the demonstration cluster, which comprised 112 OMs arranged on five strings, as well as an instrumentation string with array calibration and environment monitoring equipment, was deployed.…”
Section: Introductionmentioning
confidence: 99%