Status of engineering design of liquid lithium target in IFMIF-EVEDA

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
18
0

Year Published

2009
2009
2011
2011

Publication Types

Select...
6

Relationship

2
4

Authors

Journals

citations
Cited by 26 publications
(18 citation statements)
references
References 7 publications
0
18
0
Order By: Relevance
“…The basic structure of the loop [4] is the same as that of the target system of IFMIF [5], and all operation experience, including incidence experience, will be basically reflected to the IFMIF. Ninety percent (1830 kg) of the lithium is held in the main loop, and the residual quantity (approximately 200 kg) is held in the purification and impurity monitoring loops.…”
Section: Overview Of Eltlmentioning
confidence: 99%
“…The basic structure of the loop [4] is the same as that of the target system of IFMIF [5], and all operation experience, including incidence experience, will be basically reflected to the IFMIF. Ninety percent (1830 kg) of the lithium is held in the main loop, and the residual quantity (approximately 200 kg) is held in the purification and impurity monitoring loops.…”
Section: Overview Of Eltlmentioning
confidence: 99%
“…Two concepts, namely Bayonet and Lip Seal, are considered for the target assembly [1]. JAEA has a responsibility with the Lip Seal concept, and has an idea to use the laser beam for cutting and welding of the lip part of the flanges.…”
Section: Remote Handlingmentioning
confidence: 99%
“…Function of the Li target system is mainly to keep the steady flow of the liquid Li with 15 (10-20) m/s under the deuterium irradiation with 10 MW (1 GW/m 2 × 0.01 m 2 ). Design requirements of IFMIF Li target were summarized in the previous paper [1].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…The EVEDA tasks related to the Li target facility consist of six tasks. The EVEDA tasks related to the Li target facility was outlined by Nakamura et al [1]. Among these tasks, as a major Japanese activity, a Li Test Loop called the EVEDA Li Test Loop (ELTL) is now under construction at the O-arai site of the Japan Atomic Energy Agency (JAEA), scheduled for completion at the end of February 2011.…”
Section: Introductionmentioning
confidence: 99%