2014
DOI: 10.1016/j.fusengdes.2013.12.056
|View full text |Cite
|
Sign up to set email alerts
|

Status of the ITER vacuum vessel construction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
6
0

Year Published

2015
2015
2022
2022

Publication Types

Select...
7
1

Relationship

1
7

Authors

Journals

citations
Cited by 25 publications
(6 citation statements)
references
References 1 publication
0
6
0
Order By: Relevance
“…The UPs are designed as an integral part of the ITER VV providing access to the inside of the VV for installation and maintenance of the in-vessel components, plasma heating systems, diagnostics, blanket and first wall manifolds, and water flows for VV cooling and baking [9][10][11]. The UPs are double-wall welded structures made of austenitic stainless steel type 316L(N)-IG.…”
Section: Ups Of the Iter Vvmentioning
confidence: 99%
“…The UPs are designed as an integral part of the ITER VV providing access to the inside of the VV for installation and maintenance of the in-vessel components, plasma heating systems, diagnostics, blanket and first wall manifolds, and water flows for VV cooling and baking [9][10][11]. The UPs are double-wall welded structures made of austenitic stainless steel type 316L(N)-IG.…”
Section: Ups Of the Iter Vvmentioning
confidence: 99%
“…The VV construction consists of three main components: the main vessel, the port structures and the VV supporting system [1,2]. The port structures include the full-size ports at the upper, equatorial and lower levels of the machine and additional local penetrations at the lower level [3,4].…”
Section: Description Of the Vv Upper Portsmentioning
confidence: 99%
“…Production of the raw material was started after verification of IO and agreed notified body (ANB) for the mill maker's quality plan, product qualification report, and shop qualification. The VV sector#6 manufacturing was started in February 2012 after the completion of the manufacturing readiness review by IO and ANB with all verification for the manufacturing design, manufacturing and inspection plan, qualification of welding, non-destructive examination (NDE), and shop [4,5].…”
Section: Introductionmentioning
confidence: 99%