2016 IEEE Power and Energy Society General Meeting (PESGM) 2016
DOI: 10.1109/pesgm.2016.7741153
|View full text |Cite
|
Sign up to set email alerts
|

Stochastic distribution system operation considering voltage regulation risks in the presence of PV generation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

1
45
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 24 publications
(46 citation statements)
references
References 0 publications
1
45
0
Order By: Relevance
“…Nodal power injections at time t should satisfy the instantaneous constraints (5b)-(5e). Further, the infinitely many variables are coupled across time via the objective function and the average constraints (5f) and (5g), hence challenging the solution of (5). A stochastic optimization approach for tackling (5) is pursued in the next section.…”
Section: Problem Formulationmentioning
confidence: 99%
See 2 more Smart Citations
“…Nodal power injections at time t should satisfy the instantaneous constraints (5b)-(5e). Further, the infinitely many variables are coupled across time via the objective function and the average constraints (5f) and (5g), hence challenging the solution of (5). A stochastic optimization approach for tackling (5) is pursued in the next section.…”
Section: Problem Formulationmentioning
confidence: 99%
“…The apparent power capability for smart inverters is set to 1.3 times the nameplate capacity of the associated PV. Performance is evaluated in terms of the energy management cost and the instantaneous counterpart of the cost in (5). All algorithms were implemented using MATLAB and CVX on an Intel CPU @ 3.4 GHz (32 GB RAM) computer [41].…”
Section: Numerical Testsmentioning
confidence: 99%
See 1 more Smart Citation
“…Solar generation from residential photovoltaics (PVs) can fluctuate by up to 15% of their rating within one-minute intervals [2]. Utilityowned voltage control equipment, such as load-tap-changing transformers, capacitor banks, and step-voltage regulators, involves discrete control actions, and its lifespan is related to the number of switching operations [3]. Regulating voltage under increasing renewable generation may require more frequent Manuscript Color versions of one or more of the figures is this paper are available online at http://ieeexplore.ieee.org.…”
Section: Introductionmentioning
confidence: 99%
“…In [13], the stochasticity present in the forecasts was dealt by setting up a robust reactive power optimization framework which was subsequently solved by an approach similar to Bender's decomposition, known as the column and constraint generation algorithm. A chance constrained approach to solve the stochastic VVC problem was considered in [14], whose solution algorithm was more or less similar to the gradient descent algorithm. However, the solutions required a posteriori validation through Monte Carlo trials because of the non-convex nature of the power flow equations.…”
Section: Introductionmentioning
confidence: 99%