2018 IEEE International Reliability Physics Symposium (IRPS) 2018
DOI: 10.1109/irps.2018.8353548
|View full text |Cite
|
Sign up to set email alerts
|

Stochastic modeling of air electrostatic discharge parameters

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

0
3
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(3 citation statements)
references
References 12 publications
0
3
0
Order By: Relevance
“…Moreover, the different orientation of the same ESD generator may lead to different test results. It must be mentioned that during the verification of the ESD generators, ESD discharges are contact discharges because the reproducibility of air discharge currents is a major problem [12][13][14][15].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Moreover, the different orientation of the same ESD generator may lead to different test results. It must be mentioned that during the verification of the ESD generators, ESD discharges are contact discharges because the reproducibility of air discharge currents is a major problem [12][13][14][15].…”
Section: Introductionmentioning
confidence: 99%
“…In [15], NBA was used to predict the rise time and the maximum current using as input data humidity and the voltage before discharge. In the current study, NBA is used as a prediction tool for EM fields produced by ESD generators from the discharge current's characteristics in terms of the distance and the direction of the ESD generator from the tested equipment.…”
Section: Introductionmentioning
confidence: 99%
“…This Standard prescribes the calibration procedure of the ESD generators (or guns) that simulate the real ESD current, which must be made only for contact discharges. This happens due to the high reproducibility of contact discharges in addition to air discharges, in which the peak current may differ from one discharge to another due to the different arcs that are produced [25][26][27][28][29]. It is also the simplest case to examine in an uncertainty evaluation budget.…”
Section: Introductionmentioning
confidence: 99%