2016
DOI: 10.1016/j.apenergy.2015.12.024
|View full text |Cite
|
Sign up to set email alerts
|

Stochastic profit-based scheduling of industrial virtual power plant using the best demand response strategy

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
41
0

Year Published

2017
2017
2022
2022

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 108 publications
(41 citation statements)
references
References 36 publications
0
41
0
Order By: Relevance
“…As an agent in the retail market, VPP aggregates the capacity of DERs (ie, wind power plants [WPPs], photovoltaic generators [PV], and conventional diesel generators [DG]) and makes a single operational profile to participate in electricity market. 2 The main difference between a VPP and a microgrid is that the VPP is not necessarily limited to a specific geographical location. 3 Moreover, in addition to considering technical aspects of DERs, VPPs pay special attention to the economical operation of their components in the electricity market environment.…”
Section: Motivation and Problem Descriptionmentioning
confidence: 99%
“…As an agent in the retail market, VPP aggregates the capacity of DERs (ie, wind power plants [WPPs], photovoltaic generators [PV], and conventional diesel generators [DG]) and makes a single operational profile to participate in electricity market. 2 The main difference between a VPP and a microgrid is that the VPP is not necessarily limited to a specific geographical location. 3 Moreover, in addition to considering technical aspects of DERs, VPPs pay special attention to the economical operation of their components in the electricity market environment.…”
Section: Motivation and Problem Descriptionmentioning
confidence: 99%
“…With deep concern about virtual power plants, scheduling optimization considering DR is presented in [21][22][23]. In [21,22], the DR uncertainty is addressed by using stochastic approaches for the maximization of virtual power plant profit. Different DG resources are included.…”
Section: Related Work and Contributionmentioning
confidence: 99%
“…A comprehensive survey of DR programs and their benefits in SDNs has been presented in the study of Siano . In the study of Nostratabadi, two types of DR programs have been incorporated in the energy scheduling of the industrial virtual power plants (VPPs) aiming at maximizing profit. The utilization of DERs aiming at providing reserve capacity would be an appropriate solution for compensating the unpredicted power variations of intermittent renewable generations.…”
Section: Introductionmentioning
confidence: 99%