2017 IEEE Manchester PowerTech 2017
DOI: 10.1109/ptc.2017.7981191
|View full text |Cite
|
Sign up to set email alerts
|

Stochastic security-constrained generation expansion planning methodology based on a generalized line outage distribution factors

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
7
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
6
1

Relationship

1
6

Authors

Journals

citations
Cited by 8 publications
(7 citation statements)
references
References 24 publications
0
7
0
Order By: Relevance
“…Step 1: OOS blocking The innermost reaching Zone 6 is set to encompass the outermost zone of phase distance protection that has been selected for OOS. Using (10) and considering a 20 per cent safety margin:…”
Section: Parameter Valuementioning
confidence: 99%
See 1 more Smart Citation
“…Step 1: OOS blocking The innermost reaching Zone 6 is set to encompass the outermost zone of phase distance protection that has been selected for OOS. Using (10) and considering a 20 per cent safety margin:…”
Section: Parameter Valuementioning
confidence: 99%
“…Large power swings, stable or unstable, can cause unwanted protection relay operations at different network locations, which can aggravate further the power-system disturbance and cause power blackouts [10].…”
Section: Introductionmentioning
confidence: 99%
“…Therefore, an iterative filtering process is implemented to determine the minimum set of contingency constraints limiting the feasible solution space. Although this sequential algorithm is suitable for N-1 line outages, its extension to tighter security criteria involving N-k contingencies may experience some computational issues [23]. In [19], the authors extend their previous work [18] to solve the stochastic PSCUC problem applying the progressive hedging algorithm.…”
Section: Introductionmentioning
confidence: 99%
“…For example, objective functions can be profit maximization of a generation company in the restructured power market [9], maximizing reliability [10], [11], minimizing operating costs [12], [13], and minimizing environmental pollution [14], [15]. In addition, constraints such as network security constraints [16], [17], [18], [19] , [20] , [21], investment costs [22], [23], [24], reliability [25], [26], [27], [28], [29], and environmental pollution [30] could be part of the constraints that are required to be considered in the GEP problem. Although less attention has been paid to the GEP problem in the presence of wind power plants in the literature, extensive studies have been carried out on GEP of traditional power plants with various objective functions and constraints [31], [32].…”
Section: Introductionmentioning
confidence: 99%