2011
DOI: 10.4028/www.scientific.net/amm.127.105
|View full text |Cite
|
Sign up to set email alerts
|

Straightness of U75V 100m Heavy Rail under Deferent Straightening Processes

Abstract: Temperature of the head, the waist, the bottom and angle of the bottom of same heavy rail lying on the cooling bed is tested continuously, time interval is 5min, which can provide the basis for prebending process. Additionally, the U75V 60Kg/m heavy rail straightening processes using the horizontal and edge roll compound straightening machine is discussed in this paper, and contrasts the cross-section dimension and straightness of heavy rail before and after being straightened, which is important to make certa… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The convective heat transfer coefficient between steel surface and open air was applied to the rail bottom since compressed air around rail head has little influence on rail bottom. The whole heat treatment process takes 80 s. 28…”
Section: Finite Element Model Of Wheel–rail Contactmentioning
confidence: 99%
“…The convective heat transfer coefficient between steel surface and open air was applied to the rail bottom since compressed air around rail head has little influence on rail bottom. The whole heat treatment process takes 80 s. 28…”
Section: Finite Element Model Of Wheel–rail Contactmentioning
confidence: 99%