2016
DOI: 10.1049/iet-gtd.2015.1305
|View full text |Cite
|
Sign up to set email alerts
|

Strategic CBDR bidding considering FTR and wind power

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2018
2018
2021
2021

Publication Types

Select...
6
2

Relationship

1
7

Authors

Journals

citations
Cited by 25 publications
(6 citation statements)
references
References 40 publications
0
6
0
Order By: Relevance
“…For Case 1, because the wind ramps up with the same load ramp direction, the ramp-up product price is still 0. For Case 2, the wind ramp-up price is $13.75/MW, as shown in Equation (28). Therefore, the clearing price for the ramp-up product increases to $43.75/MW, which recovers the opportunity cost of curtailing wind to provide the rampup product.…”
Section: Ramp Price For Wind Ramping Productsmentioning
confidence: 99%
See 1 more Smart Citation
“…For Case 1, because the wind ramps up with the same load ramp direction, the ramp-up product price is still 0. For Case 2, the wind ramp-up price is $13.75/MW, as shown in Equation (28). Therefore, the clearing price for the ramp-up product increases to $43.75/MW, which recovers the opportunity cost of curtailing wind to provide the rampup product.…”
Section: Ramp Price For Wind Ramping Productsmentioning
confidence: 99%
“…ε are the auxiliary binary variables [27][28][29][30]. The forecast uncertainty of other power plants offers can be modeled through a set of the probabilistic scenarios.…”
Section: Mixed-integer Linear Programmingmentioning
confidence: 99%
“…Equations (9)- (12) are the detailed formulations of the chargedischarge cost, the SR cost provided by MTs, the fuel cost of MTs, and the SR cost, respectively, provided by ESS, where T and t denote an entire scheduling cycle and a time period (in hours), respectively. In (9), ω rt_price, t is the TOU price during period t, P t CH and P t DC are the ESS charge-discharge powers, respectively.…”
Section: Img Operation Costmentioning
confidence: 99%
“…MT represents the MT output power during the period t. In (12), ω rc_price denotes the SR price of the ESS, and P Ress, t is the reserve capacity provided by ESS.…”
Section: Img Operation Costmentioning
confidence: 99%
“…PTP obligation is a financial transmission right (FTR) product used in electricity markets such as in Electric Reliability Council of Texas (ERCOT). A few papers have investigated bidding strategies with consideration of FTR [17], [18]. Joint bidding strategies in the FTR and energy markets are investigated in [19].…”
Section: Introductionmentioning
confidence: 99%