2016
DOI: 10.1016/j.ijmst.2016.09.015
|View full text |Cite
|
Sign up to set email alerts
|

Strategic mining options optimization: Open pit mining, underground mining or both

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

1
31
0
5

Year Published

2018
2018
2024
2024

Publication Types

Select...
8
1
1

Relationship

1
9

Authors

Journals

citations
Cited by 61 publications
(37 citation statements)
references
References 13 publications
1
31
0
5
Order By: Relevance
“…Характер перехода пород из ненарушенного состояния в нарушенное определяется соотношением геометрических параметров выработок, в том числе: При прогнозировании влияния пустот на земную поверхность исходят из того, что без учета величины и знака напряжений создаются условия для разрушения массива [11,12].…”
Section: рис 2 система разработки с магазинированием: 1руда; 2 -горunclassified
“…Характер перехода пород из ненарушенного состояния в нарушенное определяется соотношением геометрических параметров выработок, в том числе: При прогнозировании влияния пустот на земную поверхность исходят из того, что без учета величины и знака напряжений создаются условия для разрушения массива [11,12].…”
Section: рис 2 система разработки с магазинированием: 1руда; 2 -горunclassified
“…In general, mine production scheduling is the determination of the sequence and processing of mineralized material that maximizes the overall net present value subject to technical and operational constraints, while shielding the mining operation from risk [1], [2]. Strategic mining decisions could be made at different time scales entailing varying objectives for long-term, medium-term, and short-term plans.…”
Section: Introductionmentioning
confidence: 99%
“…In recent years, these results and some other ideas relating to open pit mines have been used to implement mathematical models for optimizing underground mines or a combination of open pit and underground operations. Ben-Awuah et al [1] used mixed integer linear programming to investigate mining strategies for maximizing NPV, when the options of open pit, underground, and concurrent open pit and underground mining are available. King and Newman [11] developed a mixed integer programming (MIP) algorithm for optimizing the cut-off grades in pre-determined zones in an underground mine for maximum NPV.…”
Section: Introductionmentioning
confidence: 99%