Strategically estimated CapEx: wave energy converter costs breakdown and parameterisation

Abstract: In wave renewable energy, the Capital Expenditure (CapEx) is often a fixed number or depends on a single variable (e.g. power or converter characteristic mass). Hence, it poorly highlights the CapEx dependency on the Wave Energy Converter (WEC) and Wave Energy Farm (WEF) design, which in turn depend on the site characteristics. As, most of CapEx components are accessible by wave companies nowadays, this article introduces the new generic CapEx method. This method is divided into three steps: (1) distinguishing… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 54 publications
0
0
0
Order By: Relevance
“…When the CAPEX discount lasts for longer, the CAPEX per AEP will face less pressure. Thus, it would reduce the cost part of the LCOE [32].…”
Section: Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…When the CAPEX discount lasts for longer, the CAPEX per AEP will face less pressure. Thus, it would reduce the cost part of the LCOE [32].…”
Section: Resultsmentioning
confidence: 99%
“…The CAPEX for wave energy is often a fixed number or depends on a single variable (e.g., converter characteristic mass or reference cost). Nowadays, most CAPEX components are accessible by wave companies [32]. The CAPEX can be accumulated by the cost centers, which usually include the cost of one converter and its installation, cost of cable, cost of the substation, cost of the electrical installation, Energies 2023, 16, 2144 4 of 30 and cost of the mooring system and its installation [33].…”
Section: Literature Reviewmentioning
confidence: 99%
“…In accordance with Equations ( 2) and (3), string base cost is the sum of several components, including SW (structural engineering), SP (pickup system), SC (control system), MC (mooring and connection system), BU (buoyancy system), SOP (start-up and operating procedures), and SAM (site assessment and management). Each of these components constitutes the total cost of the WEC, and this equation provides a method for calculating the total cost based on the individual costs of each component [4].…”
Section: Literature Review 21 Economic Efficiency Equationmentioning
confidence: 99%