2018
DOI: 10.1061/(asce)as.1943-5525.0000843
|View full text |Cite
|
Sign up to set email alerts
|

Stress Analysis of a Long-Span Steel-Truss Suspension Bridge under Combined Action of Random Traffic and Wind Loads

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
5
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 16 publications
(5 citation statements)
references
References 21 publications
0
5
0
Order By: Relevance
“…Compared with field test, numerical analysis on VBCV could be used to explore various loading scenarios and bridge conditions with a lower cost (Chen and Wu, 2009; Deng and Cai, 2010). In the past researches, numerical simulations on VBCV have been performed by many researchers (Han et al, 2018; Yau and Yang, 2008; Zhang and Cai, 2013). In this study, the modal superposition and coupled method is employed to establish the VBCV analysis model for curved bridge.…”
Section: Vbcv Numerical Model For Curved Bridgementioning
confidence: 99%
“…Compared with field test, numerical analysis on VBCV could be used to explore various loading scenarios and bridge conditions with a lower cost (Chen and Wu, 2009; Deng and Cai, 2010). In the past researches, numerical simulations on VBCV have been performed by many researchers (Han et al, 2018; Yau and Yang, 2008; Zhang and Cai, 2013). In this study, the modal superposition and coupled method is employed to establish the VBCV analysis model for curved bridge.…”
Section: Vbcv Numerical Model For Curved Bridgementioning
confidence: 99%
“…Mature construction methods include the deck crane construction method [16], and the cable crane construction method, among others [8,9]. Rail cable shifting (RCS) is a new, recently invented method, and it was firstly used in the successful erection of the girder of the Aizhai Bridge [17][18][19][20][21][22][23]. The erection of the 1000.5-m steel truss girder required only two and a half months [16].…”
Section: Introductionmentioning
confidence: 99%
“…The mature construction methods include the deck crane construction method [16], the cable crane construction method, among others [8][9]. The rail cable shifting (RCS) is a recently invented new method, and it was firstly used in the successful erection of the girder of Aizhai Bridge [17][18][19][20][21][22][23]. The erection of the 1000.5m steel truss girder needed only two and a half months [16].…”
Section: Introductionmentioning
confidence: 99%